PROJECTS
The complete list of projects carried out can be consulted here :
Some projects
Water Supply and Sanitation Infrastructure project in Kisumu under the LVWATSAN Program
2025 - On going
Kisumu, Kenya
Lake Victoria South Water Works Development Agency (LVSWWDA)
AFD, EIB, EU-AITF
ANENZ Consulting (as subcontractor of ARTELIA), TeamLeader
○ New Intake Victoria Lake in Dunga and Water Treatment Plant (48,000 m3/day) and Nyalenda Ponds (Works 2 – Lot 2): FIDIC Red Book
○ Kisumu Western Corrido Otonglo Wastewater Treatment Plan (Works 3 – Lot1): FIDIC Yellow Book
○ Sewerage Network: (Works 3 – Lot2): FIDIC Red Book
○ Rehabilitation, Improvement and Expansion of Kisat Wastewater Treatment Plant, Sanitation for satellite Towns (Works 3 – Lot2): FIDIC Yellow Book
Preliminary and Detailed Designs, Tender Documents Preparation, Preparation of Environmental and Social Safeguard Documents, and Supervision of Construction Works.
Shinyanga Water and Sanitation Project
2025 - On going
Shinyanga, Tanzania
Shinyanga Water Supply and Sanitation Authority (SHUWASA)
AFD
ANENZ Consulting (as subcontractor of ARTELIA), TeamLeader
○ Component 1 - water supply infrastructure: 287 km of pipelines, 1 tank of 1,500 m3, 1 water tower, kiosks, house connections, SCADA, Ning’hwa dam rehabilitation and extension, Water Treatment Plant rehabilitation and extension, Pumping Station, Transmission pipelines and water supply network extensions, House connections, SHUWASA new headquarters building
○ Component 2 - Sewerage and sanitation: 4 no. FSTP, 36 no. Public Toilets, Staff houses for FSTPs
Design Review, Preliminary Studies, Detail Design, ESIA & RAP, Tender Documents, assist client in tendering process, Works Supervision and Commissioning
Development of Water and Sanitation Infrastructure for the Mbarara – Masaka Areas & Isingiro Water and Sanitation Project
2024-2025
Mbarara, Masaka, Isingito, Uganda
National Water and Sewerage Cooperation (NWSC) & Ministry of Water and Environment (MWE)
AFD
ANENZ Consulting (as subcontractor of SUEZ Consulting (Safège)), Team Leader
Technical Assistance to NWSC & MWE for The Overall Project Management South Western Cluster)
Compliance upgrade of the Lavancia - Epercy hydroelectric power plant
2024
Lavancia – Epercy, France
Aventron - Société des Chutes De l'Ain (SCA)
ANENZ Consulting (as subcontractor of ELCIMAÏ Environnement), Works Supervisor
Partial demolition of the existing plant, implementation of a new coarse screen, creation of a downstream fish passage facility and sediment flushing channel, intake and connections to the river “la Bienne”.
○ Approval of Contractor’s execution documents (VISA)
○ Supervision of the Mechanical and Civil Works (DET)
○ Commissioning (AOR)
Northern Collector System Raw Water and treated Water Pipelines
2019 to 10/2022
Nairobi, Kenya
Athi Water Services Board
AFD
EGIS - Team Leader, Project Director
The Project is part of the Northern Collector Project which is the second phase of the development scenario selected under the Water Sources Master Plan for Nairobi and 13 Satellite Towns, prepared by Egis from 2010 to 2012.
This project is related to the second component for the construction of the raw and treated water pipelines ((138,000 m3/day).
The new pipeline route is as follows:
○ Raw Water Transimission Main from downstream of existing Thika Dam to proposed new Treatment Works at Kigoro (5.5 km long, DN 1200)
○ Treatment Water transmission Main from Outlet Chamber at new Treatment Works at Kigoro to existing Kabete Tanks via the existing Ngethu-Gigiri-Kabete pipeline route/Wayleave (48.9 km long DN1200 +10.4 km long DN800).
○ Detailed design
○ Preparation of tender Documents
○ Technical assistance for the procurement of works (Tender, offer analyzing)
○ Construction supervision
○ Commissioning of the works
Clean Oceans Project Identification and Preparation (COPIP)
2020 to 10/2022
Coastal sub-Saharan African countries (except South Africa)
European Investment Bank (EIB)
EGIS - Wastewater and Storm Water Key-Expert
The Clean Oceans Project Identification and Preparation (COPIP) Programme will identify and prepare projects in sub-Saharan Africa that contribute to reducing the discharge of plastics to the oceans. These projects will focus on Solid waste management with focus on plastics; Wastewater management systems ; Urban storm water management systems ; 3 years ; € 5,6m (studies)
○ Leading teams for wastewater and storm water
○ Ensuring high-quality performance of the studies and other COPIP outputs and deliverables
○ Ensuring the timely implementation of activities in wastewater and storm water sector
○ Management of units of Non-key experts (local and international) in this sector
Name of assignment or project: Lake Victoria Water and Sanitation in Mwanza
2019 to 10/2022
Mwanza, Tanzania
Mwanza Urban Water and Sanitation Authority (MWAUWASA)
AFD, EIB
EGIS - Project Director
Construction supervision of 5 contracts under FIDIC Red and Yellow books in Mwanza City and 3 satellite towns, including water treatment plants (2.000 m3/h and 3 units of 650 m3/h total), transmission mains, pump stations, distribution networks, customers connections (13,000 connections), waste water treatment plant and sewer lines, constructions costs: € 80m
○ Project coordination
○ Design review
○ Tender review as FIDIC Red and Yellow Book
○ Tender analysis and assistance in contract awarding
○ Supervision, testing and commissioning
Solid landfill Kossihouen
2017 – 12/2018
Abidjan, Ivory Coast
Ministère de la Salubrité, de l’Environnement et du Développement Durable of the Ivory Coast Republic
PPP
ARTELIA - Project Director and Team Responsible (technical part), Solid Landfill Expert, Resident Engineer (Supervision)
Solid landfill, sized for 8 000 000 m3 of domestic waste (class2), including leachate and biogas treatment, access road, and the operation for 5 years
○ Technical (design, build and operation) part of Tender for a Financing
○ design, build and operation contract
○ offer analysing, assistance to the client in negotiation and awarding
○ Supervision
Construction supervision of the Khan Younis wastewater treatment plant
2015 – 12/2018
Khan Younis, Palestine
United Nations Development Program (UNDP)
Kingdom of Japon
ARTELIA - Procurement expert, Contract Manager, Team Leader
The objective of this 2nd contract (following the studies and tender documents performed by Artelia in 2008-2010) is to ensure treated water reuse for agricultural irrigation. Capacity: 26,600 m3/d (240,000 PE)
○ Project coordination
○ Design review
○ Tender review as FIDIC Red Book
○ Tender analysis and assistance in contract awarding
○ Supervision and commissioning
Moulin Saulnier hydropower plant project
07/2017
Noisiel, France
COFELY Services – GDF SUEZ
ARTELIA - Work Implementation Director on site
The project purpose is to build a small HPP on the site of an existing and decommissioned hydropower facility, located on a branch of the Marne River. The new HPP is a reinforced concrete structure to be created inside an existing side weir with the installation of a VLH type.
○ Feasibility study
○ Permitting documentation
○ Design
○ Selection of civil work execution sub-contractor
○ Work management
○ Supervision as turnkey contractor
Yerevan water and wastewater system improvements
2013 – 2017
Yerevan, Armenia
Yerevan municipality
French Ministry of Finance
ARTELIA - Procurement Expert, Contract Manager, Team Leader, Resident Engineer (3/16 - 2/17)
RPE project divided into 3 components:
○ Component 1 - Rehabilitation of Aeratsia WWTP: Rehabilitation of the screenings and grit removal, addition of primary sedimentation, sludge dewatering and liming for landfill disposal. Capacity: 350 000 m3/day - 1,3 M PE
○ Component 2 - Water supply and wastewater projects: Renewal of 18 km of networks, extension and modifications of 15 km of water supply networks, rehabilitation of the main collectors and 10,000 connection replacements of detached houses.
○ Component 3 - SCADA of water supply networks: Automation of well fields and SCADA water supply networks
○ Constructions costs: € 25m
For all components:
○ Detailed design
○ Tender (FIDIC Red Book)
○ Tender analysis and assistance in contract awarding
○ Supervision and commissioning
North Gaza wastewater treatment plant
2014 – 2015
Gaza, Palestine
Palestinian Water Authority (PWA)
WB
ARTELIA - Team Leader, Civil works Expert and Contract Specialist
344,000 PE which represent 36,500 m3/d in the first phase, 548,000 PE which represent 49,300 m3/d in the second phase
○ Design review
○ Review of tender documents
○ Assistance with works contracts
○ Supervision of plant works
○ Assistance for all contract’s claims & Institutional Arbitration
Gabal El Asfar wastewater treatment plant Phase II, Section II
2010 – 2018
Gabal El Asfar, Egypt
Construction Authority for potable and Wastewater (CAPW)
AfDB
ARTELIA - Team Leader, Procurement Expert, Contract Manager
500,000 m3/d capacity wastewater treatment plant, construction in compliance with FIDIC Yellow Book, constructions costs: € 80m
○ Design review
○ Tender documents
○ Bid analyses - Awarding assistance for works contracts
○ Supervision of plant works
○ Assistance for all contract’s claims & Institutional Arbitration
Complete design services and construction supervision for the construction of emergency drinking water reservoirs
2009 – 2015
Muscat Governorate, Oman
Public Authority of Electricity and Water (PAEW)
ARTELIA - Project Director
Over 16 different sites, construction of reinforced concrete reservoirs with a total capacity of 2.35 Mm3 (99 reservoirs ranging from 15,000 m3 to 50,000 m3, with a water depth ranging from 5 m to 7 m), involving major earthworks (20 Mm3 of excavations), connection to the network, pumping station,Cost of works: € 460m.
Complete design services and construction supervision:
○ Preliminary
○ Detailed design studies
○ Tender documents
○ Bid evaluation
○ Supervision of works
○ Acceptance procedures
New city of Lusail (200,000 inhabitants)
2010 – 2015
Lusail, Qatar
Architecture Studio France (and Real Estate Lusail Development, Qatar)
ARTELIA - Team Leader
Urban development of a district near Doha (353 ha): walkways, earthwork for green areas, marina cantilevered over the sea, building foundations and architectural ornaments, watering, street lighting and lighting effects.
○ Preliminary and detailed design studies
○ Participation in tendering procedures
○ Working designs
Study of the conversion of the Mbeubeuss landfill site in Dakar
2009 – 2011
Dakar, Senegal
Agence de Développement Municipale – Dakar
Agency for promotion of investments and works (APIX)
WB
ARTELIA - Project Director
Study concerning the closure and rehabilitation of the 75 ha Mbeubeuss landfill site (Waterproof covering ( sandy clay layer (250,000 m3) ensures coverage after remodelling of 420,000 m3), stormwater recovery, leachate and biogaz recovery and treatment, study of health and social risks and impacts, proposal of rehabilitation solutions, quantified risk assessment, dimensional design of the individual solutions, proposals for and priority ranking of an overall scenario)
○ Preliminary design study
○ Tender documents
○ Resettlement action plan
○ Environmental and social impact study
Study of the rehabilitation of the Sud Méliane I wastewater treatment plant
2012 – 2013
Tunis, Tunisia
Office National de l’Assainissement (ONAS)
AFD
ARTELIA - Project Director
Rehabilitation and extension of the plants No.1 (first commissioned in 1982) and No. 2 (first commissioned in 2010) in order to treat household and industrial wastewater from the catchment area of southern Tunis. Global capacity: 333,000 PE, 90,000 m3/d and 36,000kg BOD5/day pollution load. The project includes concrete rehabilitation of structure partially or fully immerged in wastewater, with the difficulty of maintaining the service during rehabilitation.
○ Assessment
○ Study of several sludge treatment scenarios (digester)
○ Environmental impact studies
○ Design studies
○ Tender documents (for a competitive bid)
Additional study for the Hann Bay remediation study in Dakar
2009 – 2013
Dakar, Senegal
Office National de l’Assainissement du Sénégal
AFD
ARTELIA - Project Director
Comparative studies of three options for the Hann Bay sewage interceptor (13 km long, two lift stations) at preliminary design level
○ Comparative studies
○ Preliminary design study for the choosen option
○ Tender documents
Due Diligence for 2 treatment plants in Abu Dhabi
2008 – 2013
Abu Dhabi, United Arab Emirates
Veolia & Besix (Abu Dhabi)
ARTELIA - Project Director
Technical assistance to banks (lending to the design/build/operate consortium) for two wastewater treatment plants in Abu Dhabi (Wathbah: 345,000 m3/d; 1,250,000 PE; Allahamah: 130,000 m3/d; 876,000 PE).
Technical analysis of
○ Client – builder/operator contracts
○ Design documents
○ Working design drawings
○ Performance tests (untreated water, treated water, treatment of water, sludge and odours)
and
○ Reporting to the banks, giving specific risk indicators
Rehabilitation of a household waste dump in Bastia in Corsica
2006 – 2011
Bastia, France
Communauté d’Agglomération de Bastia
ARTELIA - Project Director
Rehabilitation of the dump site, including:
○ Placing of 51,000 m3 of semi-impermeable fill:
○ Stormwater and leachate treatment
○ Access roads
○ Consolidation of the stream bed
○ Landscaping
Complete design services and construction supervision (preliminary and detailed designs – assistance with works contracts – supervision of works implementation – organization, planning and coordination - assistance with acceptance procedures)
Upgrading of Dijon-Longvic sewage treatment plant in line with standards
2003 – 2010
Dijon, France
Lyonnaise des Eaux France/Centre of Dijon
ARTELIA - Team Leader
○ Upgrading of outfall serving an equivalent population of 400,000 and treatment of carbon, nitrogen and phosphate pollution
○ Sludge and by-product treatment
○ Upgrading of the fume treatment system on the sludge incinerator
○ Odour treatment
○ Existing facilities kept in operation (at the level of the existing treatment plant outfall) during the works
○ Cost of works: € 42m
Project supervision services: assistance with works contracts - inspection of working designs - works supervision - assistance with acceptance procedures
Design services and project supervision for the construction and rehabilitation of Saint-Etienne sewage treatment plant (300,000 PE)
2003 – 2009
Saint-Etienne, France
Saint-Etienne municipal council
ARTELIA - Team Leader, Civil Engineer
○ Water treatment:
○ Stormwater treatment line - rehabilitation of the existing facilities: physico- chemical settling
○ Dry weather and light rain treatment line – Construction of new facilities: lamellar settling, extended-aeration activated sludge with aerobic areas (biological phosphate removal) and anoxic areas (denitrification), clarification
○ Sludge treatment: thickening, digestion, dewatering
○ Waste treatment: reception of septage, sand washing, biological treatment of grease
○ Sludge disposal: incineration
Complete design services and construction supervision (prefeasibility, preliminary and detailed design studies, assistance with works contracts, inspection of working designs, works supervision, organization, planning & coordination, assistance with acceptance procedures)
Sur - desalination plant
2007
Sur, Oman
OTV, Veolia group
Oman Founds
ARTELIA - Civil Engineer
New desalination plant in the vicinity of Sûr to supply the Sharqiyah region (350,000 hab.) with drinking water. Capacity: 80,200 m3/d (in addition to the existing capacity of 12,000 m3/d). Transient analysis.
Civil engineering expertise
Extension and upgrading of the Villefranche-sur-Saône urban district sewage treatment plant
2000 – 2008
Villefranche-sur-Saône, France
District de l’Agglomération de Villefranche-sur-Saône
ARTELIA - Project Manager, Civil Expert
Extension to an equivalent population of 130,000 (confined plant):
○ nitrogen, phosphorus, stormwater, sludge and odour treatment
○ denitrification. Cost of works: € 18m
Assistance to the owner: tendering, design/construction, works supervision, acceptance
Measures to make safe the roof over the river Furan, and creation of a diversion canal
2004 – 2005
Saint-Etienne, France
Saint-Etienne municipal council
ARTELIA - Team Leader
○ Consolidation of the roof over the river Furan (built in the 17th century), collection of wastewater and stormwater, passage of river beneath the city centre (with 4-storey buildings on the surface), risks of failure, urgent action required
○ Creation of a new underground channel beneath the city centre capable of handling 100-year flood discharges, the cover slab serving as an apron for the second tram line, including displacement of all networks
○ Cost of works: € 5.7m
Complete design services and construction supervision: preliminary studies – preliminary and detailed designs – assistance with works contracts – works supervision - assistance with acceptance procedures
Extension and Rehabilitation of the Biological Treatment Plant for Urban Waste in La Crau
2000 – 2006
Entressen, France
Métropole Aix-Marseille-Provence
ARTELIA - Project Director
○ Rehabilitation of the slopes and the dome, and the installation of a landfill gas and leachate collection system for the 12 million m³ of waste covering 80 ha:
○ Construction of access roads and a drainage network,
○ Installation of an impermeable layer, a geomembrane drainage system, and a reconstructed topsoil layer,
○ Installation of a fire-fighting network and an irrigation system,
○ Installation of landfill gas extraction wells,
○ Installation of a gas collection pipeline network and a flaring system,
○ Installation of a leachate recirculation system,
○ Landscape integration,
○ Construction of three new landfill cells with a total capacity of 1.8 million m³ of waste, with a triple liner impermeability system
○ Cost of works: € 17.5m
Complete design services and construction supervision: preliminary studies – preliminary and detailed designs – assistance with works contracts – works supervision - assistance with acceptance procedures